Estate-Wide Control Over Temporary Power

A major UK Port Authority introduced a structured hiring model to regain oversight of temporary energy requirements across a wide operational estate.
Emergency Power Deployment Review

A rapid review of emergency power deployment that stabilised operations, reduced risk exposure, and restored commercial control.
Behaviour Insight for Utilities Power Use

Using behavioural and usage insight to identify inefficiencies in utilities power consumption and unlock targeted savings.
Supplier Benchmarking and Commercial Alignment

Benchmarking supplier performance to realign commercial terms, improve value, and strengthen procurement control.
Construction Load Review and Generator Reduction

Reviewing construction load requirements to right size generation, reduce over specification, and cut unnecessary cost.
Rail Power Efficiency Programme

Improving power efficiency across a complex rail environment through structured review, planning, and control.
Port Generator Procurement Upgrade

Upgrading generator procurement at a major port to improve resilience, standardisation, and long term value.